con

Workplace EV Charging in the United Kingdom

Design, supply, installation and support for business EV chargepoints across the UK. Simple grants guidance, smart back-office management and reliable hardware — delivered by a specialist team.

Nationwide coverage for offices, warehouses, hospitality, education and public sector.

Fast lead times. Flexible maintenance plans.

Why install workplace EV chargers?

Make it easy for staff, fleet and visitors to charge while they work, reduce emissions and position your brand as future-ready.

  • Attract and retain talent

    Offer convenient, low-cost charging as a valued employee benefit.

  • Cut fleet running costs

    Switch more mileage to electric with smart tariffs, load management and usage reporting.

  • Support sustainability goals

    Reduce scope 1 and 2 emissions, demonstrate ESG progress and enhance your UK sustainability reporting.

  • Provide a great visitor experience

    Deliver reliable charging for customers, contractors and guests with easy app or RFID access.

Complete workplace charging solutions

From single office chargers to multi-bay fleet hubs, we tailor a solution that fits your site, electrical capacity and growth plan.

Smart AC chargepoints (7–22 kW)

Ideal for offices and day-parking. OCPP-ready, RFID/app control, tariff scheduling and driver access rules.

  • Single or dual-socket units
  • Wall or pedestal mounting
  • Durable, weather-rated enclosures

Load management & grid-friendly design

Maximise chargers without costly upgrades. Balance across phases, apply priorities and protect your main supply.

  • Dynamic load balancing
  • Peak shaving and demand limits
  • Scalable architecture

Back-office management & billing

Track energy use, assign costs and automate reimbursements for staff and fleet in one dashboard.

  • Driver groups and access control
  • Custom tariffs and payment options
  • Reporting, alerts and uptime monitoring

Cabling & civil works

Neat, compliant installs with appropriate containment, groundworks and bay markings for a professional finish.

  • Trenching and ducting
  • Signage and wheel stops
  • Accessible bay layouts

Energy integration

Align charging with solar PV, battery storage and time-of-use tariffs to lower carbon and costs.

  • Renewables-ready design
  • Smart scheduling
  • Future-proof infrastructure

Maintenance & support

Protect uptime with proactive monitoring, remote diagnostics and responsive UK support.

  • Planned service visits
  • Software updates
  • Fast on-site interventions

UK grants and funding support

We help you navigate eligibility and claim the available support to lower your project cost. Grant availability and rules can change — we will guide you through the latest steps.

Workplace Charging Scheme (WCS)

Government support administered by OZEV to reduce the cost of purchasing and installing eligible workplace chargepoints.

  • Contribution of up to 75% of purchase & installation cost, capped at £350 per socket.
  • Up to 40 sockets per applicant (across one or multiple sites).
  • Available to UK businesses, charities and public sector organisations that meet eligibility criteria.
Check my eligibility

EV Infrastructure Grant for staff & fleets (SMEs)

Designed to help small and medium-sized enterprises install the infrastructure needed for chargepoints, supporting current and future bays.

  • Funding towards wiring, posts, electrical works and at least one active charger.
  • Grant typically covers up to 75% of eligible costs, with a per-site cap (subject to scheme rules).
  • SME eligibility applies and a maximum number of sites per business can claim.

We will confirm the latest caps, site limits and criteria during your consultation and ensure your application follows current OZEV guidance.

Speak to a grants specialist
Note: All grant values and conditions are subject to change by the UK Government. Final approval is at the discretion of the relevant authority. We assist with the process but cannot guarantee funding.

Your project journey with EnergyPlus

A streamlined, low-disruption path from first conversation to live chargers.

1

Consult & survey

We review your goals, parking layout and supply capacity, then recommend the right mix of hardware and infrastructure.

2

Design & proposal

Clear drawings, phasing and itemised costings, including any grant-offset and options for future expansion.

3

Install & commission

Qualified engineers complete electrical and civil works safely, then test, network and hand over your system.

4

Support & optimisation

We provide training, monitoring and maintenance so your chargers stay reliable and cost-efficient.

Designed for UK workplaces

Offices & corporate campuses

Reserve bays for staff, directors and visitors with flexible access controls and automated cost recovery.

Logistics & light industrial

Plan AC workplace charging for vans and pool cars, with expansion paths for future DC where required.

Hospitality & retail

Encourage dwell time and repeat visits by offering dependable destination charging with clear signage.

Education & public sector

Implement compliant layouts for staff and pool vehicles with transparent reporting and budget control.

What you can expect

  • Clear, itemised proposals with no hidden extras
  • Hardware options curated for reliability and lifecycle value
  • Neat, safe installations aligned to UK regulations
  • Responsive support from a UK-based team

Ready to power up your workplace?

Get a tailored proposal with site survey, funding guidance and options to match your budget and timelines.

Start my quote Talk to an expert

Workplace EV charging FAQs

Quick answers to common questions from UK businesses.

How many chargers can my site support?

It depends on your available electrical capacity, parking layout and usage patterns. With dynamic load balancing, many sites can deploy more sockets than their raw supply would otherwise allow. We assess this during your survey and propose an optimal mix.

Do we need three-phase power?

Three-phase supply enables 11–22 kW AC charging and is common on commercial sites in the United Kingdom. If you only have single-phase, 7 kW charging is still effective for staff vehicles parked for several hours.

Can we bill employees or visitors for energy?

Yes. With a compatible back-office platform you can set different tariffs for staff, fleet and visitors, apply RFID or app access, and export reports for payroll or expense reimbursement.

What grants are available for UK workplaces?

The Workplace Charging Scheme (WCS) provides a contribution towards eligible chargers, and SMEs may also access the EV Infrastructure Grant for staff and fleets. We will confirm current rules and handle the application steps with you.

How long does installation take?

Smaller projects can be delivered quickly, often within days of approval. Larger sites with civil works, signage and multiple bays may take longer. We will provide a clear timeline in your proposal.

Request a workplace EV charging quote

Tell us a few details and our UK team will be in touch with a tailored proposal.

  • No-obligation advice and transparent pricing
  • Guidance on WCS and infrastructure grants
  • Scalable designs to match future growth
UK

Nationwide projects across England, Scotland, Wales and Northern Ireland.

Subject to site survey and final design. Grant offers depend on eligibility and current scheme rules.

Already have chargers? We can support and optimise them.

Whether your chargepoints are new or due an upgrade, our team can audit performance, refresh software, improve signage and implement better load and tariff strategies to reduce costs and boost uptime.

Book a service review Explore more EV solutions

Back to EV Charger

Updated on 21 Nov 2025